FEASIBILITY OF DRY DOCK TOWProject SummaryIn the summer of 2005, the two AFDB-9 dry dock sections were wet towed from Philadelphia, PA, to Galveston TX. Each dock section measured 350 x 229 ft. A wet tow feasibility study was performed, including a detailed stability analysis (intact and damaged) and hull bending moment calculation in waves. After a long tow, with a stop over in Key West to avoid some hurricanes, the dock sections safely arrived in Galveston and were put to work. Scope of WorkThe project scope included:Project Photograph |
|
|
|
|
|
|
|
|
|
|
Heavy-Lift Transportation Engineering | ||
On-Site Assistance | ||
Marine Surveys | ||
Marine Salvage Engineering | ||
Forensic Engineering | ||
Other Marine Services |
Transportation Projects | ||
Load-Out and Relocation Projects | ||
On-Site Marine Projects | ||
Marine Survey Projects | ||
Marine Salvage Projects | ||
Legal Projects | ||
Other Projects |
Downloads | ||
Software | ||
Industry Links |
■ | Review intact and damaged stability of each section;
|
■ | Establish design environmental criteria for the tow;
|
■ | Check strength of each section subject to wave bending;
|
■ | Estimate required bollard pull for the tow.
|