TRANSPORT OF 4 STS CRANES TO FREEPORT



Project Summary


Late 2025, a total of 4 used ship-to-shore (STS) cranes were transported in two voyages from Norfolk, VA, to Freeport, the Bahamas, using the DONGBANG GIANT NO 2 and the ZHONG YU 188. The first two STS cranes were rolled on over the DONGBANG GIANT NO 2 stern using SPMTs and steel Ro/Ro ramps. Once on deck, the STS cranes were rolled into their final position and lowered onto support rails. Seafastening consisted of wheel stoppers and roll/pitch bars. In Freeport, the cranes were unlashed and rolled off over the stern.

The second set of two STS cranes were rolled on over the side of the ZHONG YU 188, rotated, and rolled into their final position and lowered onto support rails for seafastening. After arrival in Freeport, the cranes were unlashed, rolled aft, and rotated and rolled off over the side, and lowered onto the dock rails for recommissioning.  

Scope of Work


The project scope included:


   








Project Photographs
















specialists in marine heavy-lift transportation engineering
naval architects
marine surveyors


If you can read this and do not see a MENU here, please allow for scripts to run
Est. 1992


Copyright © 2026 Argonautics Marine Engineering, Inc. - All Rights Reserved
Home  Services  |  Projects  |  News  |  Clients  |  Publications  |  References  |  About Us  |  Contact Us  |  Client Login  |

Check feasibility of various offered deck carrier vessels;
Provide design environmental criteria for the transport route;
Calculate the design vessel motions and accelerations at various points of interest on the cranes;
Check the stability of both vessels after loading;
Survey the securing of the trolleys before loading;
Provide on-site assistance to the team of Convoy Logistics Providers, Ltd. during loading and offloading;
Coordinate with on-site Marine Warranty Surveyor;
Check final seafastenings of the cranes and various associated loose items.
Rolling second crane onto Dongbang Giant No 2
Rolling second crane onto Dongbang Giant No 2
Survey top of cranes before departure
Survey top of cranes before departure
Rolling second crane onto Zhong Yu 188
Rolling second crane onto Zhong Yu 188
Rotating second on deck Zhong Yu 188
Rotating second on deck Zhong Yu 188
Turning DONGBANG GIANT NO 2 after loading both cranes